Real Example: AI Daily Digest

A complete breakdown of building a production app using the 5-Round Planning Methodology


← Previous: Templates | Back to Hub


Table of Contents


The Project Overview

What Is AI Daily Digest?

The Problem:

I subscribe to 15+ AI newsletters. Reading them daily takes 2-3 hours. I miss important articles because of information overload.

The Solution:

An RSS aggregator that:

  • Fetches articles from 15+ AI-focused newsletters

  • Summarizes each article in 2-3 sentences using OpenAI

  • Auto-categorizes content (Technical, Business, Trends, Tools)

  • Displays everything in a clean dashboard

  • Allows manual refresh on demand

Tech Stack:

  • Frontend: Next.js 14 (App Router), React 18, Tailwind CSS

  • Backend: Next.js API Routes, Node.js 18

  • Database: Supabase (PostgreSQL)

  • External Services: OpenAI API (GPT-3.5), RSS Parser

  • Deployment: Vercel

Why This Example Matters:

This isn’t a tutorial project. This is production complexity that breaks without systematic approach:

Complexity:

  • Multiple external APIs (RSS feeds, OpenAI, Supabase)

  • Async operations (feed fetching, AI processing)

  • Data processing (parsing, deduplication, categorization)

  • Performance considerations (handling thousands of articles)

Real Production Challenges:

  • What happens when RSS feeds fail?

  • How do you handle OpenAI rate limits?

  • How do you prevent duplicate articles?

  • How do you optimize database queries with large datasets?


The Results

Time to build: 18 hours from planning to production

vs. Previous project (Quick Viral Notes, built ad-hoc): 30+ hours, then 2-week refactor

Time saved: 12+ hours + avoided complete refactor

Planning Breakdown:

  • Round 1 (Goal Statement): 10 minutes → Saved 5 hours of scope creep

  • Round 2 (Requirements): 15 minutes → Saved 3 hours of unclear requirements

  • Round 3 (Architecture): 12 minutes → Saved 8 hours of refactoring

  • Round 4 (Master Prompt): Skipped (architecture fresh in context)

  • Round 5 (Phase Planning): 8 minutes → Saved 4 hours of unclear milestones

Total: 60 minutes planning saved 23+ hours


Round 1: State the Goal

This post is for paid subscribers